Distributed Network Protocol for utility SCADA and telemetry

An open SCADA protocol used between master stations, RTUs and IEDs, predominantly in electricity and water utilities, and widely deployed across Australian utility networks.

Quick facts

Governing bodyDNP Users Group
StandardIEEE 1815
TransportSerial; TCP/UDP over IP (port 20000)
ModelMaster / outstation, with unsolicited reporting
Key featuresEvent buffering, time-stamped data, class-based polling, Secure Authentication
20000TCP/UDP port
65,519Usable link addresses
1 msEvent time-stamp resolution
1990Year first developed
01 · Overview

The telemetry backbone of electricity and water utilities

DNP3 links RTU and PLC outstations to the SCADA master over radio, cellular, fibre or IP WAN. Outstations buffer time-stamped events during a comms loss and report by exception, so control rooms get a complete picture even over slow, unreliable bearers.

Most Australian DNSPs and water utilities specify DNP3 for SCADA telemetry. EEHA Automation designs, configures and commissions DNP3 networks end to end.

Industry

Dominant in electricity transmission and distribution and in water and wastewater telemetry. Also used in oil and gas pipelines, rail traction power and large irrigation schemes. Not used in factory automation.

Geography

Strongest in North America, Australia and New Zealand, South Africa and parts of South America and Asia. European utilities generally prefer IEC 60870-5-101/104, and IEC 61850 inside substations.

02 · Typical use cases

Where DNP3 fits in your integration stack

Suitability of DNP3 across the typical integration layers, from field equipment to historian.

Primary

PLC to SCADA

Core use: RTU/PLC outstation to SCADA master over radio, cellular, fibre or IP WAN.

Common

Sensor / equipment to SCADA

Protection relays, reclosers, power quality meters and IEDs report directly to SCADA or via a data concentrator (e.g. SEL RTAC, GE D400).

Limited

PLC to PLC

No native peer-to-peer. Achieved with data concentrators acting as master downstream and outstation upstream.

Limited

SCADA to historian / MES

SCADA normally feeds historians natively or by OPC UA. Inter-control-centre exchange uses ICCP/TASE.2.

Not typical

Sensor / equipment to PLC

Not a sensor or fieldbus protocol. Field instruments connect by hardwired I/O, HART or Modbus.

03 · History

Three decades of open SCADA

From Westronic's 1990 design to IEEE 1815 and Secure Authentication, DNP3 has matured into the utility standard it is today.

  1. 1990Developed by Westronic Inc. (Canada), drawing on early drafts of IEC 60870-5.
  2. 1993DNP3 "Basic 4" specification placed in the public domain; ownership passed to the newly formed DNP Users Group.
  3. 1995DNP Users Group Technical Committee formed; subset definitions (Levels 1–3) formalised.
  4. 2000sDNP3 over TCP/UDP (IP networking) widely adopted in utility SCADA.
  5. 2007Secure Authentication (SAv2) released to address spoofing and replay threats.
  6. 2010Adopted as IEEE Std 1815-2010.
  7. 2012IEEE 1815-2012 published, incorporating Secure Authentication v5.
  8. 2015IEEE 1815.1 published: mapping between DNP3 and IEC 61850.
  9. 2020sOngoing security work (SAv6 / authentication enhancements) and continued use in Australian electricity and water utilities.
04 · Security & known CVEs

Secure by design only when you make it so

Base DNP3 has no authentication or encryption: any device that can reach the outstation can issue controls. Secure Authentication (SAv5, IEEE 1815-2012) adds challenge-response authentication of critical requests but not confidentiality; TLS (IEC 62351-3) or VPN tunnels provide encryption. The 2013–14 Project Robus research found roughly 30 implementation flaws in DNP3 masters and outstations, mostly input-validation faults.

Notable vulnerabilities

ReferenceYearAffectedSummary
CVE-2013-2788
ICSA-13-252-01
2013SUBNET Solutions SubSTATION ServerImproper input validation in the DNP3 slave service. Crafted input crashes the service (CVSS v2 7.1).
ICSA-13-346-022013Cooper Power Systems Cybectec DNP3 Master OPC ServerMalformed responses cause denial of service on the master.
ICSA-14-098-012014OSIsoft PI Interface for DNP3Crafted packets can stop the interface, causing a loss of historian data.
ICSA-14-329-012014MatrikonOPC for DNPUnhandled C++ exception from malformed DNP3 traffic crashes the OPC server.

Representative, not exhaustive. Check CISA ICS advisories, NVD and vendor PSIRTs for the current position.

Recommended mitigations

Aligned with IEC 62443 and the ASD Essential Eight

  • Never expose DNP3 (TCP/UDP 20000) to the internet. Place outstations in a dedicated SCADA zone with conduits only to the master.
  • Use SAv5/SAv6 where supported by both ends, or IEC 62351-3 TLS / IPsec VPN for WAN links.
  • Use DNP3-aware firewalls or DPI to restrict function codes (e.g. block unsolicited writes, file transfer, restarts).
  • Keep RTU and front-end processor firmware patched, and fuzz-test new devices at FAT where feasible.
05 · Specifications

Scale, performance and reliability

Scale

Addresses16-bit link addresses, 0–65519 usable (65520–65535 reserved for broadcast/self-address).
Points per outstationUp to 16-bit (32-bit allowed) indices per object group. Typical RTUs carry hundreds to a few thousand points.
Outstations per masterHundreds to thousands per SCADA front end. Large utilities poll several thousand RTUs.
Fragment sizeLink frame up to 292 bytes with 250 bytes of user data. Application fragments typically 2048 bytes (configurable).

Performance

SpeedSerial 1200–115200 bps. IP links up to 1 Gbps. Throughput usually limited by the radio or cellular bearer.
LatencyClass 1/2/3 event polls typically take seconds; integrity (class 0) polls minutes to hours. Unsolicited reports over IP arrive in under a second. Not suitable for closed-loop control.

Reliability

Error checkingData link CRC-16 every 16 bytes of user data. Optional link-layer confirmation. Application-layer confirmations with sequence numbers.
RecoveryOutstations buffer time-stamped events during comms loss and deliver them on reconnection. IIN bits flag restart, need-time and buffer overflow.
Push / pullBoth: the master polls, and outstations send unsolicited responses.
Event basedYes: report-by-exception with class 1/2/3 events and analogue deadbands.
06 · Architecture & physical layer

Topology-agnostic, bearer-flexible

Star

Yes

IP networks: each outstation connects to the master through switches, routers or cellular.

Ring

Via network layer

Rings come from RSTP or HSR/PRP (IEC 62439-3) in substations, or from fibre rings.

Daisy chain / multidrop

Yes (serial/radio)

RS-485 multidrop and radio party-line networks share one channel. Hierarchical chains run through data concentrators.

Physical layer: wiring, distances and termination

Serial RS-232 / RS-485RS-232 point-to-point (~15 m); RS-485 2-wire half-duplex multidrop on twisted pair, 120 Ω termination each end, biasing at one point. Up to ~1200 m at low baud rates.
Licensed UHF/VHF radioTypically 1200–19200 bps, ACMA licensing in Australia. Mind RTS/CTS keying and radio turnaround delays.
IP networksEthernet copper (100 m per segment), fibre, cellular 4G/5G, microwave and satellite. TCP or UDP port 20000.
RedundancyDevice Level Ring not applicable. Redundancy at the network layer (RSTP, HSR/PRP) or by dual-channel masters.
Surge protection & earthingCritical at remote sites with lightning and long cable runs. Install in line with AS/NZS 3000 and client telemetry standards.
07 · Compatibility

Works with the platforms we partner with

Native = built into the platform · Native (module/driver) = vendor-supplied add-on · 3rd party = gateway or third-party driver/OPC server.

PlatformSupportNotes
Rockwell ControlLogix / CompactLogix3rd partyProSoft in-chassis modules or PLX gateways.
Siemens S7-1200 / S7-1500Native (comms module)TeleControl CPs, e.g. CP 1243-8 IRC (S7-1200) and CP 1542SP-1 IRC (ET 200SP).
Schneider Modicon M580 / M340Native (comms module)M580 BMENOR2200H RTU module (DNP3 and IEC 60870-5-104).
Omron NJ / NX3rd partyProtocol gateway.
Mitsubishi iQ-R3rd partyProtocol gateway.
Beckhoff TwinCAT / CODESYS3rd partyThird-party libraries or gateway.
RTUs / data concentratorsNativeDedicated RTUs and data concentrators: SCADAPack, SEL RTAC, GE D400.

Driver availability changes between releases. Confirm against the current version and licensing before quoting.

08 · Features

What the protocol gives you

  • Time stampingEvents time-stamped at source with 1 ms resolution (48-bit ms since 1970 UTC). Sync over DNP3, or NTP, PTP or IRIG-B/GPS.
  • Secure controlsSelect-Before-Operate (SBO) and direct operate controls, with quality flags on every point.
  • Rich data objectsCounters with freeze and freeze-and-clear, double-bit binary inputs, file transfer, data sets and device attributes.
  • Device profilesXML Device Profile (IEEE 1815) documenting the implemented subset, plus Subset Levels 1–4.
09 · Configuration

What we agree with you early

  1. 1Master and outstation link addresses, IP addresses and ports, and TCP keep-alive.
  2. 2Point lists: index, object group/variation, event class, deadband and scaling.
  3. 3Event buffer sizes, unsolicited reporting enable and retry, application and link timeouts and retries.
  4. 4SBO timeout, control models (pulse/latch, trip/close), time sync method and interval.
  5. 5Device Profile checked against the master’s capabilities (subset level, supported variations).
10 · Roadmap

Where DNP3 is heading

IEEE 1815 revision

In progress through the DNP Users Group, consolidating Technical Bulletins issued since 2012.

Secure Authentication v6

Centralised key management, aligned with IEC 62351-5.

DNP3 over TLS

Increasingly specified by utilities (IEC 62351-3) alongside or instead of Secure Authentication.

IEEE 1815.2 for DER

Draft application profile supporting IEEE 1547 requirements for inverters and batteries.

Coexistence with IEC 61850

IEC 61850 inside substations, with DNP3 retained for the SCADA link to the control centre.

Planning a DNP3 telemetry upgrade?

EEHA Automation's PLC, SCADA and IT/OT engineers design, secure and commission DNP3 networks for utilities, mining and transport across Australia.

EEHAEEHA Automation Industrial automation specialists. Industrial Protocols is an EEHA Automation product site. ABN 87 600 292 760
QLD Electrical Licence 1502586

Protocol profiles

DNP3Modbus · coming soonIEC 61850 · coming soonOPC UA · coming soon

Locations

Fortitude Valley QLD 4006Cleveland QLD 4163East Perth WA 6004

Contact

1800 433 422sales@eehaa.com.auOffice 8am–5pm, Mon–Fri · Support 24/7eehaa.com.au →
© EEHA Automation 2026. All rights reserved.Privacy Policy · Terms