Transformer Commissioning
We conducted the commissioning of TRX Transformer as part of site introduction.This project ensured that the equipment supplied complies with the site design, construction, and performance requirements. The task involved testing and validating the transformer protection functions to ensure that the transformer was protected from any faults that may compromise the integrity of the system.All trips, commands and statistics tested through CitectSCADA.Functionalities tested included: